Hello,
We have a customer setup where they have SAP ERP integrated with their existing CRM system over Biztalk. Now to secure the investment made in building the integrations, we believe that the bridge needs to be built only from C4C to Biztalk and once Biztalk is reached, then the existing Biztalk to SAP ERP integration piece should pick up the work that it is doing already.
What is scary is we do not know if such scenarios of Biztalk sitting between C4C and ERP exist and are possible. Could anyone share such sceanrios or challenges in what could make such setups impossible to work?
Thanks in Advance,
Vikram