Hi
I have a requirement. I have two different landscapes.
Landscape 1. ECC 1 is connected to SAP PI through proxy
Landscape 2 ECC 2 is connected to SAP PO through proxy
Both are in different DMZs.
The requirement is to have two asynchronous interfaces to be developed from ECC 1 to ECC 2 through either SAP PI or SAP PO.
What is the best possible design? I am planning to use SAP PO as the midleware

.jpeg)